Received materials
Fabric frame requirements · Commercial permit
Match physical deliveries to the approved material list. Split deliveries can build up the required quantity; the same received material cannot be reserved twice.
Material coverage
Screen material
Fixed-frame patio cover (fabric) · Fabric
2.000 of 2 each received and reserved
Approved with material gaps
- Fixed-frame patio cover (fabric) needs Fabrication work, but no material is planned for it.
That track stays stalled until you append the missing material below and receive it.
Add a missing material (append to this plan)
Adds one material to the in-flight plan without disturbing existing reservations or started work. Receive it through the normal delivery path to release its track.
Find a physical delivery
Record a delivery against a purchase order
REVIEW shared fasteners 472 · 6.000 each available
REVIEW stock vendor 472 · REVIEW simulated placement only; no vendor contacted · Received 2026-09-16 · REVIEW synthetic late receipt only; no actual materials received
View delivery historyREVIEW shared fasteners 472 · 4.000 each available
REVIEW stock vendor 472 · REVIEW simulated placement only; no vendor contacted · Received 2026-09-16 · REVIEW synthetic partial receipt only; no actual materials received
View delivery historyREVIEW shared brackets · 2.000 each available
REVIEW stock vendor 469 · REVIEW simulated order only; no vendor contacted · Received 2026-09-16 · REVIEW synthetic delivery; no actual materials received
View delivery historyREVIEW two posts · 0.000 each available
REVIEW supplier 445 · REVIEW-PO-445 · Received 2026-09-15 · REVIEW445 delivery 2
View delivery historyREVIEW two posts · 0.000 each available
REVIEW supplier 445 · REVIEW-PO-445 · Received 2026-09-15 · REVIEW445 delivery 1
View delivery historyREVIEW example fabric · 0.750 yards available
REVIEW — Delivery verification · REVIEW-601 · Received 2026-09-14 · REVIEW delivery B
View delivery historyREVIEW example fabric · 1.250 yards available
REVIEW — Delivery verification · REVIEW-601 · Received 2026-09-14 · REVIEW delivery A
View delivery historyAssign initial shop work
Start stays blocked until this track’s received quantities, specifications and other prerequisites are satisfied. Assignment does not start a timer.
Allocation history and corrections
REVIEW two posts · 1.000 each
REVIEW counted post matched to this synthetic product
9/15/2026, 7:33:57 PM Phoenix
Reserved for work that has started. A used-material correction needs review.
REVIEW two posts · 1.000 each
REVIEW counted post matched to this synthetic product
9/15/2026, 7:33:51 PM Phoenix
Reserved for work that has started. A used-material correction needs review.