Fabric frame requirements · Job 1016
Fabric can be prepared from confirmed measurements when the physical frame is not needed. Payment, specification and received-material checks still apply.
Fixed-frame patio cover (fabric) · Qty 1
Physical frame required · Product-type default
Physical frame confirmed available for the current specifications.
REVIEW synthetic physical frame checked against current confirmed measurements. · Christian Amondson · 9/15/2026, 7:34:00 PM Phoenix time