Fabric frame requirements · Job 1015
Fabric can be prepared from confirmed measurements when the physical frame is not needed. Payment, specification and received-material checks still apply.
Recover — refabric an existing frame · Qty 1
Can prepare from confirmed measurements · Product-type default