Back to received materials
Fabric frame requirements · Job 997
Fabric can be prepared from confirmed measurements when the physical frame is not needed. Payment, specification and received-material checks still apply.
Product-type defaults
Fixed frame patio cover · Qty Not recorded
Can prepare from confirmed measurements · Product-type default
Fixed frame awning · Qty Not recorded
Can prepare from confirmed measurements · Product-type default
Does fabric preparation need the physical frame?Use product-type default Physical frame required Can prepare from confirmed measurements
Physical frame available for fabric measurementsNot confirmed available Yes · I checked the physical frame This check applies to the current product specifications. A changed product needs another check.
Reason / what was checked Save fabric frame record