Match physical deliveries to the approved material list. Split deliveries can build up the required quantity; the same received material cannot be reserved twice.

Material coverage

Posts

Fixed frame patio cover — metal roof · Fabrication

2.000 of 2 each received and reserved

Fabric

Standard fixed frame awning · Fabric

2.000 of 2 each received and reserved

Frame steel

Standard fixed frame awning · Fabrication

2.000 of 2 each received and reserved

Add a missing material (append to this plan)

Adds one material to the in-flight plan without disturbing existing reservations or started work. Receive it through the normal delivery path to release its track.

Find a physical delivery

Record a delivery against a purchase order

REVIEW Fabric · 0.000 each available

REVIEW supplier · REVIEW-27917edd · Received 2026-09-21 · REVIEW packing slip

View delivery history
REVIEW Frame steel · 0.000 each available

REVIEW supplier · REVIEW-27917edd · Received 2026-09-21 · REVIEW packing slip

View delivery history
REVIEW Posts · 0.000 each available

REVIEW supplier · REVIEW-27917edd · Received 2026-09-21 · REVIEW packing slip

View delivery history
REVIEW shared fasteners 472 · 6.000 each available

REVIEW stock vendor 472 · REVIEW simulated placement only; no vendor contacted · Received 2026-09-16 · REVIEW synthetic late receipt only; no actual materials received

View delivery history
REVIEW shared fasteners 472 · 4.000 each available

REVIEW stock vendor 472 · REVIEW simulated placement only; no vendor contacted · Received 2026-09-16 · REVIEW synthetic partial receipt only; no actual materials received

View delivery history
REVIEW shared brackets · 2.000 each available

REVIEW stock vendor 469 · REVIEW simulated order only; no vendor contacted · Received 2026-09-16 · REVIEW synthetic delivery; no actual materials received

View delivery history
REVIEW example fabric · 0.750 yards available

REVIEW — Delivery verification · REVIEW-601 · Received 2026-09-14 · REVIEW delivery B

View delivery history
REVIEW example fabric · 1.250 yards available

REVIEW — Delivery verification · REVIEW-601 · Received 2026-09-14 · REVIEW delivery A

View delivery history
Assign initial shop work

Start stays blocked until this track’s received quantities, specifications and other prerequisites are satisfied. Assignment does not start a timer.

Allocation history and corrections

REVIEW Fabric · 2.000 each

REVIEW match

9/21/2026, 10:53:46 AM Phoenix

Reserved for work that has started. A used-material correction needs review.

REVIEW Frame steel · 2.000 each

REVIEW match

9/21/2026, 10:53:46 AM Phoenix

Reserved for work that has started. A used-material correction needs review.

REVIEW Posts · 2.000 each

REVIEW match

9/21/2026, 10:53:46 AM Phoenix

Reserved for work that has started. A used-material correction needs review.