DESIGN REVIEW — seeded data · your changes save here and are wiped on the next reseed · switch persona

Fabric frame requirements

CA
Back to received materials

Fabric frame requirements · Job 1017

Fabric can be prepared from confirmed measurements when the physical frame is not needed. Payment, specification and received-material checks still apply.

Product-type defaults

Fixed frame shade · Qty 1

Physical frame required · Product-type default

This check applies to the current product specifications. A changed product needs another check.